Skip to content

Catalog update [tekton-fbc-operator-2026-418] [v4.18,v4.19,v4.20,v4.21] - #6830

Open
rh-operator-bundle-bot wants to merge 1 commit into
stagefrom
add-tekton-fbc-operator-2026-418-0.0.42-to-fbc-4503
Open

Catalog update [tekton-fbc-operator-2026-418] [v4.18,v4.19,v4.20,v4.21]#6830
rh-operator-bundle-bot wants to merge 1 commit into
stagefrom
add-tekton-fbc-operator-2026-418-0.0.42-to-fbc-4503

Conversation

@rh-operator-bundle-bot

Copy link
Copy Markdown
Collaborator

🚀 Automated PR: FBC Release Process

This pull request was automatically generated as part of the FBC release process.

  • Operator: tekton-fbc-operator-2026-418
  • Version: 0.0.42
  • Image: registry.connect.stage.redhat.com/tekton-pipeline-automation/tekton-fbc-operator-2026-418@sha256:b2280218944c48ec32cbc087ca9ab351312c8e743019d94de27ad1a1893fe316

For reference, see the previous PR.

If you have any questions or need modifications, please let us know!

Signed-off-by: rh-operator-bundle-bot <exd-guild-isv+operators@redhat.com>
@rh-operator-bundle-bot rh-operator-bundle-bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Feb 26, 2026
@rh-operator-bundle-bot rh-operator-bundle-bot changed the title Auto FBC release tekton-fbc-operator-2026-418 0.0.42 Catalog update [tekton-fbc-operator-2026-418] [v4.18,v4.19,v4.20,v4.21] Feb 26, 2026
@rh-operator-bundle-bot

Copy link
Copy Markdown
Collaborator Author

@rh-operator-bundle-bot

Copy link
Copy Markdown
Collaborator Author

There were some errors while publishing your Operator Bundle. You can use this support case to contact the Red Hat certification team for review.

@rh-operator-bundle-bot

Copy link
Copy Markdown
Collaborator Author

Pipeline Summary

Pipeline: operator-hosted-pipeline
PipelineRun: operator-hosted-pipeline-runf8br6
Start Time: 2026-02-26 13:51:41+00:00

Tasks

Status Task Start Time Duration
✔️ get-pr-number 2026-02-26 13:51:41+00:00 6 seconds
✔️ acquire-lease 2026-02-26 13:51:51+00:00 6 seconds
✔️ set-github-status-pending 2026-02-26 13:52:02+00:00 6 seconds
✔️ set-github-started-label 2026-02-26 13:52:02+00:00 7 seconds
✔️ set-env 2026-02-26 13:52:15+00:00 6 seconds
✔️ clone-repository 2026-02-26 13:52:25+00:00 19 seconds
✔️ clone-repository-base 2026-02-26 13:52:26+00:00 18 seconds
✔️ detect-changes 2026-02-26 13:52:46+00:00 41 seconds
✔️ check-permissions 2026-02-26 13:53:31+00:00 42 seconds
✔️ set-github-pr-title 2026-02-26 13:54:15+00:00 6 seconds
✔️ read-config 2026-02-26 13:54:24+00:00 48 seconds
✔️ resolve-pr-type 2026-02-26 13:55:13+00:00 6 seconds
✔️ validate-catalog-format 2026-02-26 13:55:23+00:00 42 seconds
✔️ build-fragment-images 2026-02-26 13:56:07+00:00 57 seconds
✔️ content-hash 2026-02-26 13:57:05+00:00 9 seconds
✔️ certification-project-check 2026-02-26 13:57:16+00:00 36 seconds
✔️ get-organization 2026-02-26 13:57:57+00:00 36 seconds
✔️ get-pyxis-certification-data 2026-02-26 13:58:37+00:00 38 seconds
✔️ verify-project 2026-02-26 13:59:18+00:00 6 seconds
✔️ update-cert-project-status 2026-02-26 13:59:25+00:00 6 seconds
static-tests 2026-02-26 13:59:33+00:00 a minute

Pipeline logs: https://gist.github.com/rh-operator-bundle-bot/83a4a74c01694fa6c412966fc68dd27c

Troubleshooting

Please refer to the troubleshooting guide.

Run /pipeline restart operator-hosted-pipeline in case of pipeline failure to restart a pipeline.

@openshift-merge-robot

Copy link
Copy Markdown

PR needs rebase.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository.

@openshift-merge-robot openshift-merge-robot added the needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. label Mar 3, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. operator-hosted-pipeline/failed

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants