Skip to content

feat(web): split onboarding newsletter into its own third step (#4106) #270

feat(web): split onboarding newsletter into its own third step (#4106)

feat(web): split onboarding newsletter into its own third step (#4106) #270

Triggered via push June 10, 2026 16:24
Status Cancelled
Total duration 58s
Artifacts
Full UI regression
0s
Full UI regression
Matrix: ui_extended
Matrix: ui_p0
Fit to window
Zoom out
Zoom in

Annotations

9 errors
UI P0 (project-workspace)
Canceling since a higher priority waiting request for ui-extended-main-push-refs/heads/main exists
UI P0 (project-workspace)
The operation was canceled.
UI P0 (settings-connectors)
Canceling since a higher priority waiting request for ui-extended-main-push-refs/heads/main exists
UI P0 (settings-connectors)
The operation was canceled.
UI P0 (entry-onboarding)
Canceling since a higher priority waiting request for ui-extended-main-push-refs/heads/main exists
UI P0 (entry-onboarding)
The operation was canceled.
UI P0 (runtime-recovery)
Canceling since a higher priority waiting request for ui-extended-main-push-refs/heads/main exists
UI P0 (runtime-recovery)
The operation was canceled.
ui-extended-main
Canceling since a higher priority waiting request for ui-extended-main-push-refs/heads/main exists