Skip to content

chore(deps): update dependency vite-plugin-solid to v2.11.10 #598

chore(deps): update dependency vite-plugin-solid to v2.11.10

chore(deps): update dependency vite-plugin-solid to v2.11.10 #598

Triggered via pull request January 8, 2026 16:33
Status Failure
Total duration 58s
Artifacts

test.yml

on: pull_request
Matrix: test_stable
Fit to window
Zoom out
Zoom in

Annotations

10 errors
test_stable (1.75.0, ubuntu-latest)
Process completed with exit code 101.
test_stable (1.75.0, macos-latest)
The strategy configuration was canceled because "test_stable._1_75_0_ubuntu-latest" failed
test_stable (1.75.0, windows-latest)
The strategy configuration was canceled because "test_stable._1_75_0_ubuntu-latest" failed
test_stable (1.75.0, windows-latest)
The operation was canceled.
test_stable (stable, macos-latest)
The strategy configuration was canceled because "test_stable._1_75_0_ubuntu-latest" failed
test_stable (stable, macos-latest)
The operation was canceled.
test_stable (stable, windows-latest)
The strategy configuration was canceled because "test_stable._1_75_0_ubuntu-latest" failed
test_stable (stable, windows-latest)
The operation was canceled.
test_stable (stable, ubuntu-latest)
The strategy configuration was canceled because "test_stable._1_75_0_ubuntu-latest" failed
test_stable (stable, ubuntu-latest)
The operation was canceled.