Pin dependencies #21
ci.yml
on: pull_request
Annotations
9 errors
|
test-3.12
Process completed with exit code 1.
|
|
test-3.13
The strategy configuration was canceled because "test._3_12" failed
|
|
test-3.13
The operation was canceled.
|
|
test-3.10
The strategy configuration was canceled because "test._3_12" failed
|
|
test-3.10
The operation was canceled.
|
|
test-3.11
The strategy configuration was canceled because "test._3_12" failed
|
|
test-3.11
The operation was canceled.
|
|
test-3.14
The strategy configuration was canceled because "test._3_12" failed
|
|
test-3.14
The operation was canceled.
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
combined-coverage
|
27.6 KB |
sha256:f8d3da36a104b458093805673768ebe85b27ac4b2cfab2ed1a54df700648da0f
|
|