feat<display refactor> implement initial LCD abstraction #7
push.yml
on: push
Matrix: build
Matrix: build_multi-lang
tests
16s
check_c-cpp
37s
check-settings-docs
6s
check_python
16s
check_shell
8s
check_docs
19s
upload_metadata
Annotations
24 errors
|
build (TS80P)
Process completed with exit code 2.
|
|
build (TS100)
The strategy configuration was canceled because "build.TS80P" failed
|
|
build (TS100)
Process completed with exit code 2.
|
|
build (Pinecil)
The strategy configuration was canceled because "build.TS80P" failed
|
|
build (Pinecil)
Process completed with exit code 2.
|
|
build (S60)
The strategy configuration was canceled because "build.TS80P" failed
|
|
build (S60)
Process completed with exit code 2.
|
|
build (TS80)
The strategy configuration was canceled because "build.TS80P" failed
|
|
build (TS80)
Process completed with exit code 2.
|
|
build (S60P)
The strategy configuration was canceled because "build.TS80P" failed
|
|
build (S60P)
Process completed with exit code 2.
|
|
build (T55)
The strategy configuration was canceled because "build.TS80P" failed
|
|
build (T55)
Process completed with exit code 2.
|
|
build (MHP30)
The strategy configuration was canceled because "build.TS80P" failed
|
|
build (MHP30)
Process completed with exit code 2.
|
|
build (Pinecilv2)
The strategy configuration was canceled because "build.TS80P" failed
|
|
build (Pinecilv2)
The operation was canceled.
|
|
build (HS02)
The strategy configuration was canceled because "build.TS80P" failed
|
|
build (HS02)
The operation was canceled.
|
|
build_multi-lang (Pinecilv2)
Process completed with exit code 2.
|
|
build_multi-lang (Pinecil)
The strategy configuration was canceled because "build_multi-lang.Pinecilv2" failed
|
|
build_multi-lang (Pinecil)
Process completed with exit code 2.
|
|
build (TS101)
The strategy configuration was canceled because "build.TS80P" failed
|
|
build (TS101)
The operation was canceled.
|